Portfolio
 
 

Oswego Grande Park Jr. High School Site
26923 West Grande Park BLVD
Plainfield, IL. 60544

Superintendent: Joe Berry
Updated on: 6-12-08
.

  • Carpets are being installed
  • Final flooring is being completed
  • Finishing trims for all mechanical trades
  • Mill work is being finished
  • Total job site is 95% complete
  • Ceilings, flooring and final painting are being completed
  • Landscaping is 50%
 


Archived Images:
5-1-08
2-13-08
11-26-07
5-30-07
7-22-07

 


Archived Images:
5-1-08
2-13-08
1-09-08
11-20-07
9-06-07
9-11-07

 

Ogden Professional

Superintendent: Rob Cinto
Updated on: 6-12-08

  • Third and second floors have been poured.
  • All floors have been poured.
  • 80% glass is in
  • All rough plumbing, electric and rough HVAC is in.
  • Tremco Roofing is complete.
  • Arched upper & lower canopy roofs are rough framed. They are being prepared for composite panel system.
  • All floors are rough framed.
  • 3rd floor is dry walled.
  • 2nd floor dry wall started on site
  • Exterior precast is painted.
  • Monumental exterior sign has been poured.
  • Final grading has begun.
  • Final sidewalks and curbs are prepared for concrete.  

New Aurora Police Station
Aurora, Illinois

Superintendent: Dan Peterson
Project Manager: Bill Arnolde
Updated on: 6-26-08

TAS Building:

  • ½ of the Metal Decking for the roof is complete
  • Precast panels are complete
  • Steel erection detailing in progress, approximately 75% complete
  • Electric Overhead Rough-in is going in
  • Electrical & Storage area floors are pored.

    ______________________________________

Parking Garage:

  • Foundations are complete for parking garage
 

Archived Images:
6-26-08/2
6-26-08
6-20-08/2
6-20-08
5-13-08
5-13-08/1

5-13precast-2
5-13precast-1
2-15-08
9-6-07

Archived Images:
5-1-08
2-13-08
7-20-07
6-13-07

 

KVR
Aurora, Illinois

Superintendent: Tim Werrline
Updated on: 6-12-08

  • Future patio areas and matching sidewalks are completed
  • Final painting is being completed on site
  • Roofers are installing the slate shingles. Process is about 90% complete
  • Future patio areas and matching sidewalks are completed
  • Brickwork on building is complete
  • Main power is hooked up
  • Glazing is 98% complete
  • Window frames and glass are installed.
  • “EIFS” is being installed on site. (A textured wall that looks similar to stucco) Process is about 90% complete

Greene Field Park

Superintendent: Mike Testa
Updated on: 6-26-08
Project Status: Complete

  • Buildings are finished on site.
  • Playground is erected.
  • Fence and dugout are in place.
  • Seating and baseball fields are complete
 


Archived Images:
5-1-08
4-07-08
4-04-08
11-26-07



Archived Images:
6-12-08
5-13-08
5-1-08

 

The Tillers Health Care Residence
Oswego, Illinois

Superintendent: Gary Ellingwood
Updated on: 6-12-08

  • Glass is all in
  • South Door is being installed
  • All other doors are in
  • Dirt/Grading is started in preparation for exterior concrete
  • Drywall is finished
  • Cabinets are being installed
  • Smokes and fire alarms are in
  • Duct work is finished

FVPD Blackberry Farms Silo Repair
Updated on: 5-13-08

  • The Silo at the Fox Valley Park District’s Blackberry Farms was starting to lean because of rotting at the base from age.
  • R.C. Wegman shored the bottom of the silo, jacked it up and cut out the rotted wood.
  • It was replaced with a masonry base.

 

 


 

 

 


 

 



 

 